Renovation of the road surface of the municipal road P - 03 “Gārzde - Ūdrande darbnīca” from 4.28 to 5.85 (1.57 km) (works are still in progress)

Subcontractor: SIA “VIA”

Type of construction: resurfacing

Construction time: 07.2021. - 09.2021.

Main works performed: dismantling works; removal of peripheral soil growth and overgrowth on both sides of the road up to the edge of the road (up to the ditch); construction of PP SN8 DN / ID 800, PP SN8 DN / ID 500 and PP SN8 DN / ID 300 culverts; milling of the existing asphalt concrete pavement to a thickness of 20 cm, profiling and compacting; construction of 0 / 32ps base load-bearing layer of unbound mineral materials; double surface treatment VAG2 16/22 and 8/11 (granite chippings) (by priming with granite chippings); installation of road signs, etc. works.